Griffin Ukuleles
  • Home
  • About
  • Woods
  • Available Instruments
  • Construction
  • Blog
  • Contact
  • testimonials
  • Ukulele Stuff
  • Untitled

THE SIXTH DAY ! --27 days left.

9/2/2019

0 Comments

 
The assembly of Stuart Fuchs's tenor is going well.  The sides are on and anchored by the sound board tentalones, the upper tentalones are installed and awaiting the back.  Tomorrow I will cut in the side sound port and possibly get that back on.  
Picture
While the glue for the tentalones was drying I turned to installing the frets.  First you cut them, then you tap them in with a little glue and seat them with the arbor press.
Picture
before long I had them installed.  Now off to a Labor Day block party.  Going to take a bunch of ukes as we normally have a bit of a sing-a-long and some uke lessons at the picnic.  I will take great strides tomorrow.
Picture
HAPPY LABOR DAY
0 Comments



Leave a Reply.

Powered by Create your own unique website with customizable templates.